The home building process, step by step

From first idea to moving in, a new home passes through the same stages. Here is the order, and who looks after each one.

The stages in order

  1. Idea and briefWhat you want, your block and your budget.
  2. Site checkZone, overlays, title and services.
  3. Concept designFloor plan and a 3D model to walk through.
  4. Cost estimateAn itemised estimate against the budget.
  5. Planning consentWhere the project needs it.
  6. Working drawingsFull drawings, engineering and energy report.
  7. Wastewater approvalDesign and council approval, where not on sewer.
  8. Building rules consentChecked against the National Construction Code.
  9. Development approvalYour go ahead to build.
  10. Builder and contractQuotes, selection and a signed contract.
  11. ConstructionThe build, with inspections along the way.
  12. HandoverFinal checks, then the keys.

The steps in green are approvals. The wastewater approval applies only where the site is not on mains sewer. Everything else is design, pricing or building.

Design comes before everything

The first four stages shape the whole project. A clear brief and a quick check of the site stop you designing something the block or the budget cannot carry. The concept and the estimate are worked on together until both feel right.

Approval is two consents

Planning consent looks at what you are building and where. Building rules consent looks at how it is built. When your project has the consents it needs, development approval is issued. Some homes need both consents and some need only one.

Then the build

With approval in hand, the working drawings go to builders to price. Once you have signed a contract, construction starts. Inspections happen at set stages, and the job finishes with a handover.

We can stay involved during the build if you want someone checking the work against the drawings.

This is general information for South Australia. Rules vary with the zone and overlays on each block, so check your own site before you rely on it.

Related

How we workCouncil approval servicesDo I need council approval?

Ready to start?

Tell us what you have in mind, however rough the idea. The first consult is free.

Get in touchCall 0400 707 091

Call 0400 707 091Enquire