Flat roof carport beside a stone wall

Services

Council approval services in South Australia

We take the hard work out of your council application.

Book a free consultSee our work

Council and planning approvals

How we help

Council approval can feel like a maze. You do not need to know the Planning and Design Code, the PlanSA portal or the paperwork. That is our job.

Hand the whole thing to us, or have us walk beside you through each step. Either way, we prepare the drawings and documents, lodge the application and answer the assessor's questions for you.

Where something is missing, such as engineering, a survey or a wastewater design, we raise it early and can help organise it. Regular updates are part of how we work, so you can see where your application is up to and what comes next.

What is included

Your project, covered

  1. A check of the zone and overlays that apply to your site
  2. Advice on which consents and which assessment pathway apply
  3. Drawings and supporting documents prepared to suit
  4. Lodgement through the PlanSA portal
  5. Responses to requests for information
  6. Wastewater design and the wastewater application to council, for sites with a septic or on-site system
  7. Coordination of referrals and consultant reports
  8. Heritage applications
  9. Your decision notification and stamped plans passed on to you and your builder

How approval works in South Australia

Two consents make one approval

Planning consentWhat you build and where, assessed against the Planning and Design Code
+
Building rules consentHow it is built, checked against the National Construction Code
=
Development approvalYour go ahead to start building

Not every project needs both consents. We can work out which apply before the drawings start.

Plus wastewater approval, where the site is not on mains sewerA septic or on-site system is designed to suit the soil and the size of the house, then assessed by council as its own application. We can arrange the design and lodge it with the rest.

Assessment pathways

Accepted

Minor work that needs no planning consent. Building rules consent is still required.

Deemed to satisfy

The proposal meets the set criteria in the Code, so planning consent must be granted.

Performance assessed

The proposal is assessed on its merits against the Code. Some applications are notified to neighbours.

How it works

Step by step

  1. Free first consult

    We talk through what you want and look at your site.

  2. Written fee proposal

    You get the work set out in stages, with a fee for each.

  3. Design and drawings

    We prepare the drawings and keep you involved as they develop.

  4. Lodgement and approval

    We lodge the application and manage it through to a decision.

To get started

What we need from you

  1. The site address
  2. A description of what you want to build
  3. Any drawings, quotes or engineering you already have
  4. The Certificate of Title, if you have it

Fill in the project form

The form opens in Google Forms and works on a phone. Don't have it all? That is fine. Skip what you do not know, or give us a call.

What the form covers

Common questions

Good to know

How long does council approval take?

It depends on the assessment pathway and whether the assessor asks for more information. Once we know your site and what you want to build, we can tell you which pathway applies and what to expect.

What is a request for information?

It is a formal request from the assessor for more detail before a decision is made. We prepare and lodge the response for you.

Who decides my application?

It depends on the project. It may be your council, an assessment panel or an accredited professional such as a private building certifier.

What is an overlay?

Overlays are extra layers of rules that apply to particular areas, such as heritage, bushfire risk or coastal flooding. They can change what you can build and which reports you need.

Do I need a wastewater approval?

If your site is not on mains sewer, a new home or an addition with extra bathrooms or bedrooms usually needs a wastewater system designed and approved by council. It is a separate application from planning and building consent. We can arrange the design and lodge it alongside the rest of the application.

More questions and answers

Other services

New home designRenovations and additionsCommercial and industrialSheds, garages, carports, verandahs and decksCost estimation

Ready to start?

Tell us what you have in mind, however rough the idea. The first consult is free.

Get in touchCall 0400 707 091

Call 0400 707 091Enquire