Two consents, one approval
In South Australia the go ahead to build is called development approval. For most projects it is made of two parts. Planning consent looks at what you want to build and where, measured against the Planning and Design Code. Building rules consent looks at how it will be built, checked against the National Construction Code.
Once both are granted, development approval is issued and you can start. Applications are lodged online through the PlanSA portal.
Three pathways you will hear about
The Code sorts work into assessment pathways. Accepted development is minor work that needs no planning consent, only building rules consent. Deemed to satisfy development meets set criteria in the Code, so planning consent must be granted when it complies. Performance assessed development is judged on its merits, and some of these applications are notified to neighbours.
Which pathway applies depends on your zone, any overlays on the land such as heritage, flooding or bushfire, and the details of the design. Two blocks in the same street can be treated differently.
How to find out for your block
PlanSA has a free online check that asks a few questions and tells you whether approval is likely to be needed. It is a good first step.
If the answer is unclear, or the design is close to a limit, that is where we come in. We check the zone and overlays before any drawings are started, so you know which consents apply before you spend money.
This is general information for South Australia. Rules vary with the zone and overlays on each block, so check your own site before you rely on it.